Invited Lecture |
ⅠConcrete for Marine Structures |
Tor Ole OLSEN |
(1) |
ⅡCivil Infrastructure Management and Strategic Innovation Program of Council of Science, Technology and Innovation |
FUJINO Yozo |
(11) |
General Paper |
| |
Title |
Name |
Page |
(1)Design of the Kyotanabe Viaduct in the New MEISHIN Expressway (1) - 15 Span Continuous PC Mixed Girder Bridge - |
UMEDA Takaaki NODA Tsubasa OKUBO Takashi SUZUKI Satoshi |
1 |
(2)Design of the Kyotanabe Viaduct in the new MEISHIN expressway (2) - 13 Spans Pre-tensioned PC Connected T-girder Bridge - |
MITA Takehiro NODA Tsubasa OOKUBO Takashi OKUMURA Takahiro |
5 |
(3)Design and Construction of YAHATA Junction A Ramp Bridge (No.1-2) |
KAWANAKA Ryoichi NAGAI Gorou MATSUMOTO Masashi NODA Tsubasa |
9 |
(4)The Construction Report of PC Continuous Box Girder Bridge by Three-division Construction |
KAJIWARA Shohei FUKUZAKI Masayuki TANAKA Norikazu AMANO Hironori |
13 |
(5)Construction of Yonsen River Bridge in Asahikawa - Tokachi Road |
IKEZOI Masaki TAKA Mitsuyuki HAMAGUCHI Tatsumasa ISHII Megumi |
17 |
(6)Design and Construction of Long Span Simple Girder Bridges |
OGAWA Tomohiro NODA Tsubasa
|
21 |
(7)Construction of Tagajo Viaduct (Nangu Area) |
KITAGAWA Yuji SAKAI Seiji OGINOME Taishi MURATA Nobuyuki |
25 |
(8)Construction of Box-Girder Bridge by Using Fixed-Support on The Soft Foundation - Kasumi No.4 Road Bridge - |
INOUE Yoshiyuki HIRANO Masahiro MATSUZAKI Jyunya USHIBA Shigetomo |
29 |
(9)Construction by Fixed Support Method Under Severe Site Condition - Honma 2nd Viaduct - |
ONO Masayuki OMU Masami NISHIMURA Kazuyuki |
33 |
(10)Construction of PC Through Bridge Under Severe Construction Environment |
TOMINAGA Satoshi OOHASHI Ryouhei UJI Yoshitomo |
37 |
(11)Construction of OKEGAWA 4th Viaduct under the High Voltage Line |
TSUKUSHI Hiroyuki MURATA Kenji SHIBATA Hiroshi SUZUKA Yoshikazu |
41 |
(12)Construction of PC Box Girder with Precast Segment Method in Irabu Bridge - Irabu Ohashi the 10 Construction - |
ABE Shinichi OMURA Kazuma SHIMOKAWA Hiroshi OKUMA Masahiro |
45 |
(13)Construction of Joukou River Bridge |
TANINO Kazuo EIRAI Ryougo TAKIHANA Seigo SHIMIZU Hidekazu |
49 |
(14)Construction of PC Simple Roadbed Synthetic T Girder Bridge in the Narrow Yard (Toyama Nabeta Bridges) |
SUZUKI Hiroyasu IZUMI Yukihide TAKANAGA Masahiro YANAGIHARA Hidekatsu |
53 |
(15)Construction of 7-span Connected Girder Bridge with Pretensioned T-shape Girder in AYARAGI Viaduct |
TAKAGI Tooru OOSHITA Takashi CHAKI Satoru |
57 |
(16)Control Method with Temporary Prestressing for the Camber of Pretensioned Concrete Girder |
TAKENOI Isamu TAKASHIMA Tomoyuki TANIGUCHI Hirotsugu ASAI Hirotaka |
61 |
(17)Construction of Bridge Substructure and Foundation of PPRC-Well (Kunen Bridge) |
SUNAKO Youichi SUGISAWA Yasutomo ONUMA Kou UEMURA Norio |
65 |
(18)Basic Study of High Durable PC Bridge with Fiber Reinforcement Material |
KOMURA Yutaka OHYAMA Hiroaki NAKAI Seiki ENOMOTO Tsuyoshi |
69 |
◇ (19)Research and Development of Bearing Replacement Technology for Void Slab Bridge |
OHBAYASHI Atuhiro KOIZUMI Takahiro GOUDA Yuuichi KATO Takuya |
73 |
(20)Seismic Retrofit of Reinforced Concrete Arch Bridge located in the Hot Spring Area -Beppu-Myoban Bridge in the Oita Expressway- |
MORI Syougo MIURA Yasuhiro OBARA Tominori KIDO Yasuhiko |
79 |
◇ (21)Experimental Studies for Seismic Strengthening using Aramid FRP rod of RC Columns |
ANDO Naofumi FUJIWARA Yasuhisa NIHEI Tatsuya TANAKA Akira |
83 |
(22)Removal of the Existing PC Bridge as for Construction of Hazawa Station in Sotetsu-JR Direct Connection Line |
TAKASUKA Nobuki MATSUO Tomoaki FUKAYA Takahisa |
89 |
(23)Removal and Building of the PC Bridge which Received Damage from Salt Water - Number 1 of National Highway, Wasegawa Bridge Removal and Building Construction - |
WAKAMATSU Takeomi OKABAYASHI Hidekatsu YAMAZAKI Mitsutoshi |
93 |
(24)Construction Report for Repair of Monorail Girder by Raising |
UCHINO Syuuji MISUMI Tetuya SUGAYA Akihiko |
97 |
(25)Seismic Retrofit of Hikojima Ohashi |
KIDERA Hisayuki MATSUOKA Takeshi TOKUNAGA Yuji ANDO Naofumi |
101 |
(26)It is the Re-reinforcement of the Cable Outside RC Ramen Supporting Beam |
NAKAMURA Tsukasa YAMAGISHI Toshikazu KANTO Tsuguaki |
105 |
(27)Retrofit Design in the Continuation of the Gerber Hinge at the Metropolitan Expressway Viaduct |
ISHIBASHI Masahiro HANAFUSA Teizaburo WACHI Takahiro |
109 |
◇ (28)Structural Performance of Beam-Column Joint in Precast Prestressed Concrete Frame Assembled by Unboned Tendons |
KANEMOTO Kiyoomi KITAYAMA Kazuhiro SONG Sung Hoon JIN Kiwoong |
113 |
◇ (29)Study on Flexural Strength of PC Column Section subjected to Bidirectional Deformation |
YONEZAWA Tetsuhisa KISHIMOTO Ichizo
|
119 |
◇ (30)The Compressive Character and its Reinforcement of Super High Strength Concrete Structure |
OYAMADA Tetsuya HANEHARA Shunsuke SAKAMOTO Ryu |
125 |
(31)Experimental Study of Leaving Finishing Material in the External Seismic Strengthening Method of Construction with Prestressing Tendon |
MORIYASU Kazumasa HAMAMOTO Tetsuji YAGINUMA Hiromi |
131 |
(32)Development and Fabrication of Fan-shaped Large Slab without Steps |
SAKUMURA Kazuki TAKESHITA Osamu UMAISHI Ryouta |
135 |
(33)Renovation of PC Tank; Replace RC Dome with Aluminium Dome |
SHIGETA Kazunari IKEDA Masayuki OKEYA Naoki SEGAWA Mutsuo |
139 |
(34)Construction of Takamiya Water Purification Plant No.1 High Place Distributing Reservoir |
MATSUO Yuta HAYASHI Kazutoyo NAKAHARA Susumu SAGAWA Yasutaka |
143 |
(35)About a Spring Water Measure of the Underground System PC Farm Pond |
OOMURA Akiyoshi ADACHI Kazuhiko SIMA Kenzo ITOU Tomoki |
147 |
(36)Application of CIM to the Superstructure of the PC Bridge, Shimomiya Viaduct |
SUGIMOTO Masashi TANAKA Haruhito KAWAI Katsunori INO Koji |
151 |
(37)Construction of the PC Composite Bridge by the Rigid Ground Support Construction Method, Yone Viaduct |
MATSUZAKI Junya MINOURA Teruaki NAKAMITSU Tomohiro TOKUYAMA Toru |
155 |
(38)Construction of Kitagawachi No.2 Bridge, Higashi-Kyushu Expressway (Kiyotake - Kitago) |
TANIDA Masafumi WADA Hironobu FUKUSHIMA Kuniharu |
159 |
(39)Construction of Prestressed Concrete Composite Bridge Using U Shaped Precast Girder in Limited Area |
OE Hirofumi NAKANISHI Nobuhisa HORIUCHI Tatsuto |
163 |
(40)Construction of PC Composite Bridge Using Erection Girder Under the Constraint Condition, Matsuoka Viaduct |
INOUE Noriaki AKIYAMA Takafumi KOUDUKI Daisuke |
167 |
◇ (41)Development of Prestressed Concrete Composite Bridges Using Precast PC Slabs |
HARA Kengo WATASE Hiroshi OOSHIDA Hidehaharu KAMIYA Takunobu |
171 |
(42)Construction of Ookamaya River Bridge |
KATO Tomoyasu YAMANOBE Koki YOKOCHI Kota TAKAHASHI Hiroaki |
177 |
(43)Construction of Nishinarabai Bridge |
KAWANE Masaya TOKIWA Hiroshi HANAI Takashi |
181 |
(44)Design and Construction of 3 Spans Prestressed Concrete Box Girder Bridge having a Small Radius of Curvature |
YASU Noriyuki NAGASE Tadayoshi KUSAKA Hiroki KOBAYASHI Motohiko |
185 |
(45)Strain Measurement of Prestressed Concrete Box Girder Bridge during Construction |
HAYASHI Katsuhiro ISHIDA Masahiro NAKAYAMA Yoshinao KARINO Takeshi |
189 |
(46)Construction of ASOYA BRIDGE |
SAITO Takayuki KAWASAKI Yusuke KATO Masakazu KUNIEDA Kuniyoshi |
193 |
(47)Rapid Construction of SAGAMIHARA IC BRIDGE |
KOGA Hiroyuki TAKEI Keiju MUROZONO Shinya |
197 |
(48)Construction of SHIOTSUHAMA OHASHI BRIDGE along SHIOTSU BYPASS |
SAKAGUCHI Hiroshi MIZUSHIMA Yoshiharu KURATOMI Yoshiro |
201 |
(49)Construction of BANJOUGAWA BRIDGE |
HIYOSHI Naohisa FUKUSHIMA Kuniharu FURUTANI Hitoshi OCHI Hisakazu |
205 |
(50)The Construction Report of Ogoegawa Bridge in Higashi-Kyushu-Expressway |
MIYAMOTO Masahiro IWAKI Takayuki TOMINAGA Takayuki |
209 |
(51)Construction of HAYAMA BRIDGE |
OKU Takanori IWASHITA Yoshihiro HIRANO Masaru |
213 |
(52)Construction of IROHAGAWA BRIDGE |
SHIMIZU Gouichi MURAKAMI Kimihiko NAKAHARA Susumu ADACHI Ken |
217 |
(53)Design of Joyo Junction Ramp Bridge on Shin-Meishin Expressway |
TOMONARI Hiroki TAKAHASHI Akira SUZUKI Hiroyuki YAMASHITA Ryo |
221 |
(54)Design of the Wakayama Junction A-Ramp Bridge |
NABETANI Yoshikatsu YAMAMOTO Taizo YAMAGUCHI Masao MOROHASHI Akira |
225 |
(55)Design of the Anrakugawa Bridge on Shin Meishin Expressway |
WATANABE Hikaru KOBOTA Goki TANIMOTO Yasuo KAMINAGA Yuki |
229 |
(56)Design of Corrugated Steel Web Box Girder Bridge with the World Largest Span |
MASUDA Toru TAKAHASHI Akira SENOO Kei YAMANAKA Yasushi |
233 |
(57)Construction of Shimootowagawa Bridge |
YOSHIDA Shinji IWABUCHI Masakatsu IDOGUTI Taiji MURAKAMI Rikiya |
237 |
(58)Concrete Filling Tests of Steel to Concrete Joint in ASAKEGAWA Bridge |
NAGAO Chiaki NOJIMA Shoji TONO Toshiyuki WATANABE Kouhei |
241 |
◇ (59)Study of Construction Methods of Slant Reinforced Concrete Member |
NOJIMA Shoji TONO Toshiyuki MIZUNO Satoshi WATANABE Shinya |
245 |
◇ (60)Investigation on the Cause of Vertical Cracks on the Surfaces of the Concrete Poles and its Countermeasure for ASR Mitigation |
HASHIMOTO Tohru FURUTA Masaru KANAI Shigeru TORII Kazuyuki |
251 |
◇ (61)Estimation Method for Flexural Capacity of Prestressed Concrete Beam Specimen Deteriorated by Alkali-Silica Reaction |
HIROI Yukio TODA Yoshihiko YAMAMOTO Takashi TAKAGI Yusuke |
257 |
(62)A Cause Estimation and Countermeasures of the Crazing that Occurred to PC Girder (National Route 53 NAGI BRIDGE) |
TANI Shintarou DOUTA Tadashi ITO Norimasa OKADA Shigeyuki |
263 |
◇ (63)Evaluation of the Degradation Behavior for a PC Specimen by FEM Analysis |
UEZONO Yuta KOSA Kenji ZHENG Yulong UEHARA Nobuo |
267 |
◇ (64)Experimental study of vibration characteristic in damaged PC girder |
AOKI Keiichi |
273 |
(65)Cause Estimation of Occurring Diagonal Crack in the Webs of PC Box-Girder Bridge |
SUZUKI Shin UEDA Noritoshi MANABE Hideki KATOU Hiroyuki |
279 |
(66)Applicability Verification of MFL by Experiment |
HAGIWARA Naoki MIYANAGA Kenichi AOKI Keiichi |
283 |
(67)Report on Survey and Diagnosis for Prestressed Concrete Bridge |
AMEMIYA Yoshiko FUJITA Tomotaka KOUDA Maki MORI Takuya |
287 |
◇ (68)Development of New Admixture for Durability Enhancement of Salt Corrosion and Freezing and Thawing Resistance |
TOKUMITSU Suguru MASAKI Mamoru MATSUMOTO Kenichi SATAKE Shinya |
291 |
◇ (69)Examination on Initial Stress Behavior of PC Slab with Fly Ash |
ITO Hajime SHIIRE Yuuya FUKADA Saiji SANNOH Chikao |
297 |
◇ (70)Study on Characteristics of Fly Ash Mixed Prestressed Concrete |
YAMADA Yuji HASHIMOTO Shinichiro TOKUMITSU Suguru MASAKI Mamoru |
303 |
◇ (71)Study on the Application of the Shrinkage Property, Durability and Structual Property to Classified Fly Ash Concrete |
YAMAMURA Satoshi SAKURADA Michihiro KOBAYASHI Kazuhiro TORII Kazuyuki |
309 |
(72)Construction of Pre-Tensioned Prestressed Concrete Bridge, MIYASAKA Pedestrian Bridge, using Fly Ash |
SAKURADA Michihiro YAMAMURA Satoshi TORII Kazuyuki YAMANAKA Shouhei |
315 |
(73)Construction of the Large Size Structure Loading Test Equipment Using Concrete with Classified Fine Fly Ash |
TSUNOMOTO Meguru TORII Kazuyuki FUKADA Saiji TANAKA Isamu |
319 |
(74)Characteristic of Load-Bearing Capacity of PC Beam Members Mixing Ground Granulated Blast Furnace Slag 6000 that Received the ASR Degradation |
KUNITOMI Yasushi ISHII Tsuyoshi SHIN Gunsei TORII Kazuyuki |
323 |
(75)Effect of C-S-H Type Accelerator on the Strength Development of Slag Cement Concrete |
IMOTO Harutake KOIZUMI Shinichi SUGIYAMA Tomomi KOYAMA Hiromitsu |
327 |
(76)The Early Strength Development of Early Strength Concrete using C-S-H Type Acceralator |
KOIZUMI Shinichi IMOTO Harutake BABA Yusuke KOYAMA Hiromitsu |
331 |
(77)Study on Early Strength Development of Precast Concrete with C-S-H Type Accelerator |
KOYAMA Hiromitsu DATE Shigeyuki
|
335 |
◇ (78)Experimental Investigation on Resistance to Pressure and Deformation of Polyethylene Sheaths under Concrete Casting |
UMEZU Kenji FUJII Akihiro IKEDA Hideki SHIMOMURA Takumi |
339 |
◇ (79)Behavior of PE Sheath with Concrete Temperature Rise during Early Age Immediately after Placing |
NAKAYAMA Yoshinao YASUDA Kiyoaki SAITO Shigehiko |
345 |
(80)Actual Result Investigation on Friction Coefficient of Polyethylene Sheaths in Prestressed Concrete Bridges |
SATO Toru HAMADA Yuzuru ONOZUKA Toyoaki NAKAMURA Atsushi |
351 |
◇ (81)Evaluation of the Performance to Realize the Multi-layer Protection in the PC Bridge Using the Polyethylene Sheaths |
AMAYA Kimihiko TANIYAMA Shingo OKADA Minoru WU Chengning |
355 |
(82)Development of Detection System at Optical PC Grout Filling Sensor |
TSUNODA Shinsuke HOSONO Junpei WATANABE Jun AKUTAGAWA Shinichi |
361 |
◇ (83)Evaluation of Tendon Ducts in Prestressed Concrete Bridge by Improved SIBIE |
YAMADA Masahiko OHTSU Masayasu TOMODA Yuichi TOKUMITSU Suguru |
365 |
◇ (84)Effects of Mixing Methods on Rheological Properties of PC Grout |
MATSUKA Takeju TANABE Shigeo KUDOU Ryota KIMURA Shigeaki |
371 |
(85)Study on Mixing Methods and Injection Methods of PC Grout |
KUDO Ryota TANABE Shigeo SAKATA Yusuke MATSUKA Takeju |
377 |
(86)Consideration about Rheology Properties of the Grout Using the Automatic Measurement Method |
FUJIOKA Taisuke HOSONO Hiromi OONO Kanta HOSHIDA Sinichi |
381 |
◇ (87)Isolation, Liquidity, and Characteristic of Chloride Diffusion in PC Grout Mixed with Ion-exchange Resin |
SANADA Osamu MUTSUYOSHI Hiroshi LUAN Yao |
385 |
(88)Construction Report of Slab Work for NOGUROSAWA BRIDGE |
WADA Kouiti SATO Hayato SAKAGUTI Mamoru |
391 |
(89)Replacing Construction of Slab for No.2 and No.3 Bridge of MEIJIYAMA |
FUKUDA Kensaku NISHITANI Tomoaki MURATA Kouji YOSHIMATSU Hidekazu |
395 |
(90)Replacing Construction of Deck Slab using High Strength Lightweight Precast PC Slab |
TANAKA Shinya OKU Yoshitaka AHIKO Shuuichi TAKAE Yasufumi |
399 |
(91)Crack Control Measure of Cast-in-Place PC Slab on Continuous Steel-Plate Girder Bridge -OHATA Viaduct- |
SHIBATA Kazunori YOSHIDA Hisashi NAKANISHI Daishi KATOH Kohji |
403 |
◇ (92)Basic Study on the Joint between Steel Girder and UFC Slab |
ICHINOMIYA Toshimichi KANAJI Hidesada KOSAKA Takashi TARUTANI Sachiko |
407 |
◇ (93)Development of New Vertical Joint Structure |
YASUDA Kiyoaki HARA Kengo ARAKI Shigeru HORII Tomonori |
411 |
(94)Wheel Load Running Fatigue Test of Prestressed Concrete Deck Slab with a Vertical Joint |
OYANAGI Shuichi AOKI Keiichi WADA Yoshinori KAWAMURA Naohiko |
415 |
(95)Experimental Studies for Widening of PC Slab |
FUJIWARA Yasuhisa YAMAUCHI Takahiro MORITA Akio ANDO Naofumi |
419 |
(96)Effect of Construction Technique for Deck Slab on Surface Quality of Concrete |
ASAI Hirotaka OONO Kanta SASAKI Wataru HOSONO Hiromi |
423 |
(97)Behavior of the Outside Cable at the Time of Train Passing on Kurobe River Bridge of the Hokuriku Shinkansen |
YOKOYAMA Hideki SHIMOTSU Tatsuya FUNATAKE Kouji HAYA Hiroshi |
427 |
◇ (98)Study on Monitoring Method of PC External Cable Tension Monitoring System for Railway PC-I Girders |
YUASA Koji MORIKAWA Hidenori NAKAUE Shinji |
431 |
(99)Report of The PC External Cable Tension Estimated by The New Vibration Method from Natural Frequency with Multiple Modes |
ISHIBASHI Akiko IMAI Hirayoshi KANEZAKI Takayuki KOBAYASHI Daisuke |
437 |
(100)The Investigation of Pre-stress and Reinforcement Design Report of the Pre-tension PCT Beam which was Damaged by Chloride Attack |
HIDA Kenichi NAKAZAWA Jirou HAGA Takashi YONEMOTO Masaki |
441 |
(101)The Report of the Application Experiment to a Horizontal Direction of the Prestress Introduction Method of Construction to the Existing Structure which has a Fixing Annchor |
MIHARA Takafumi MIMOTO Tatsuhiko KOJIMA Daisuke |
445 |
◇ (102)Relations of Steel Materials Corrosion and the PC Grout Infusion |
MIYANAGA Kenichi AOKI Keiichi HAGIWARA Naoki WATANABE Shinya |
449 |
(103)A Study on Grout Re-Injection Method Applied to Prestressing Steel in Cross Beam |
HONJO Kiyoshi FUJIWARA Norio TANAKA Hironori KAMOTANI Tomoshige |
455 |
(104)Experimental Study on Influence of Drilling at Anchorage Zone in Prestressed Concrete |
TANAKA Yoshiki ISHIDA Masahiro MURAKOSHI Jun YOSHIDA Eiji |
459 |
◇ (105)Integrity Evaluation of the Post-tensioning PC Bridge that Passed from Over 60 Years |
HARA Mikio HAMAOKA Kouzi AMAYA Kimihiko |
463 |
◇ (106)Numerical Analysis of Prestressed Concrete Girders Damaged by Steel Corrosion |
SAITO Shigehiko KOBAYASHI Kyoshiro
|
469 |
◇ (107)Study about the Accumulation of the Chloride Ion of Specimens under the Water Leakage Including Deicing Salts |
KAJIWARA Midori WATANABE Akio KONDO Takashi ISHIKAWA Yuichi |
475 |
◇ (108)Fundamental Study on the Corrosion Properties of PC Steel Strands |
NAKASHIMA Tomoko MIYAZATO Shinichi
|
479 |
(109)Report of Difference in Water Cement Ratio of Concrete Exposed in Marine Environment for 30 Years |
SANGA Takashi UMEMOTO Youhei SAKURABA Hiroki SASAKI Iwao |
483 |
(110)Investigation on Surface Protection for Concrete Structures Exposed to Marine Environment 30 Years |
SASAKI Iwao SAKURABA Hiroki NISHIZAKI Itaru AOYAMA Toshiyuki |
487 |
◇ (111)Experimental Study on Methods to Improve Resistance of Chloride Attack by Various Protective Coatings on Gentle Slope Concrete Surface |
WATANABE Shinya NOJIMA Shouji TONO Toshiyuki |
491 |
(112)Experimental Study on Corrosion Prevention Effect and Workability of Galvanic Anode Method |
KODA Maki AOYAMA Toshiyuki YAMAMOTO Daisuke HAMADA Hidenori |
495 |
(113)Study on Repair Works with Cathodic Protection |
KIRIKAWA Kiyoshi KUBO Kinya IKEDA Masashi KODA Maki |
499 |
(114)The Measures for Quality Assurance of the Omono Bridge Construction Work in Route 7 |
KASAI Hironori GATTO Hiroyuki SAKURADA Ryouji |
503 |
(115)Characteristics of Adiabatic Temperature Rise of High-early-strength Concrete made with SCMs |
HASEGAWA Tsuyoshi KITANO Yuichi ISHII Tsuyoshi NAKAMURA Eisuke |
507 |
(116)Prediction of Adiabatic Temperature Rise of High-early-strength Concrete made with SCMs |
KITANO Yuichi HASEGAWA Tuyoshi ISHII Tuyoshi NAKAMURA Eisuke |
511 |
◇ (117)Experimental Study on Thermal Cracking Resistance of Concrete with Supplementary Cementitious Materials |
NAKAMURA Eisuke SUZUKI Masahiro ISHII Tsuyoshi KOGA Hirohisa |
515 |
◇ (118)Estimation Method for Restrained Stresses of Concrete Containing Supplementary Cementitious Materials at Early Ages |
KAWAKANE Hajime NAKAMURA Eisuke SUZUKI Masahiro ISHII Tsuyoshi |
521 |
◇ (119)Influence of Mineral Admixture and Volume of Coarse Aggregate on the Shrinkage Crack Resistance of Early-Strength Concrete |
SASAKI Wataru TANIGUCHI Hideaki KOKUZAWA Masahiro HIGUCHI Masanori |
527 |
(120)Strength and Heating Characteristics of Concrete Using Various Curing Promoting Material |
ONDA Yosuke KOKUZAWA Masahiro SASAKI Wataru TANIGUCHI Hideaki |
533 |
◇ (121)A Study on the Basic Properties of Antiwashout Underwater Rapid Hardening Concrete with Rapid Hardening Admixture |
YAMANAKA Toshiyuki UMEMOTO Yohei TAWARA Michikazu KWAK Doyeon |
537 |
(122)Physical Properties and Durability of Latex Modified Facet Concrete |
KWAK Doyeon MORIYAMA Mamoru LI Chunhe YAMANAKA Toshiyuki |
541 |
◇ (123)The Novel Cementitious Material with 460MPa Compressive Strength by Conventional Molding |
KONO Katsuya NAKAYAMA Risa TADA Katsuhiko |
545 |
◇ (124)The Effect of Admixtures on the Microstructure of the Hardened Cement Paste |
SHIN Gunsei WU Chengning
|
551 |
◇ (125)Evaluation of Restoring Force Capacity of RC/PC Beams with Externally Bonded Prestressed BFRP Rods |
YOSHIDA Mitsuhide YAGI Yousuke IWASHITA Kentaro KAJIURA Takuma |
557 |
◇ (126)Fundamental Study on the Placed the Cover Concrete by the String of Aramid Fiber |
TAKEYAMA Tadaomi ARIKAWA Naoki SANGA Takashi ASAI Hiroshi |
563 |
(127)Flexural Capacity of Prestressed Concrete Beams with CFRP Strand Cables |
KOSE Noriaki YOKOTA Hiroshi KATOH Ema OKAZAKI Shinichiro |
569 |
(128)Recent Development of Ultra-high Strength (2100MPa) 7-wire Epoxy Coated and Filled Strand 17.8mm |
OSHIMA Katsuhito TANAKA Shuichi MATSUBARA Yoshiyuki YAMADA Masato |
573 |
(129)Research for Characteristics and Durability of Epoxy Coated PC Starnd |
HIRAI Kei FUKUJI Keita TOYOFUKU Toshiyasu |
577 |
◇ (130)Rigidity Evaluation of Railway PC Extradosed Bridges |
SOGABE Masamichi SHIMOTSU Tatsuya GOTO Keiichi SHINDO Yoshinori |
581 |
(131)Non-flood Season Construction of Extradosed Bridge in a Cold Snowy Area - CHUOU Bridge - |
KUMAGAI Yoshiaki NOZAKI Ryuichi KAWANISHI Tetsuya SHIOZAWA Tomonobu |
587 |
(132)Extensioning works of closure pourusing PC cable anchor |
YOSHIURA Nobuaki CHIBA Shinichi MATSUNAGA Hideaki |
591 |
(133)Construction of 2-Span Continuous PC Extradosed Bridge across JR Agatsuma Line |
ISOBE Yoshitaka TAKAGI Kenji AKAMINE Yasuhito YOSHITAKE Ryosuke |
595 |
(134)The Seismic Design for Single-Plane Suspension Extradosed Bridge with Long Span and Wide Width |
NAGAO Kenji HOSOTANI Manabu FUKUDA Masato MIZUTANI Masaki |
599 |
(135)Study on Transmission of Cable Tension to Main Girder in Single-Plane Suspension Extradosed Bridge with Long Span and Wide Width |
SHINJO Kohei HOSOTANI Manabu FUKUDA Masato TAKATSUGU Wataru |
603 |
(136)Study on Performance of Long Span Extradosed Prestressed Concrete Bridge during Cantilever Erection by Sequential Finite Element Analysis |
NAKA Takashi HOSOTANI Manabu FUKUDA Masato TONAMI Munenori |
607 |
(137)Design for Head Part of Hollow Pier in Extradosed Bridge with Long Span |
KANATA Takahiro HOSOTANI Manabu FUKUDA Masato OHKUMA Hikari |
611 |
◇ (138)The Effect of Adding Mineral Admixtures and Secondary Wet Curing on Compressive Strength/Durability of Steam Cured Mortar |
AZUMA Yosuke MORI Hiroaki TADA Katsuhiko |
615 |
◇ (139)The Effect of the Accelerator about Quality Improvement of the Concrete Manufactured by Steam Curing |
NAKAMURA Toshiyuki KITAZAWA Toshiharu NAMIKI Masayuki WU Chengning |
621 |
(140)Effect of Construction Technique for Wall Structure on Surface Quality of Concrete |
KOKUZAWA Masahiro SIBA Akihiro HUJIOKA Taisuke HIGUCHI Masanori |
627 |
(141)Confirmation of Management Techniques Best Floor System CN Construction Method of High-Strength Concrete |
MICHIKAMI Masahiro KOUDA Takesi YAMAMURA Atusi WAKI Yusuke |
631 |
(142)Study on Placing Joint Primer Focused on Action Mechanism |
MARUTA Hiroshi HAMANAKA Akinori NAGAI Yoshinori KWAK Doyeon |
635 |
(143)Air Bubbles Reduction Effect of the Lower Slab Haunch Part by the Horizontal Vibrator |
FUDATATE Shigeyoshi GOTO Kenji YANAGISAWA Norifumi SUGASAWA Fumihiro |
639 |
(144)Application to Field Test of PC Grout Mechanical Measuring System at Komaki Viaduct |
KATAYAMA Masao NOJIMA Syouji NAKASHIMA Kiyotaka IMAI Youhei |
643 |
(145)The Report of Construction Utilizing CIM for Trial |
OCHIAI Masaru HONBO Kaoru SAKURAI Kazuhiro SHIMADA Kouichi |
647 |
(146)Development of Measurement System for Transverse PC Steel Arrangement in Deck Slab by using Stereo Photography Technology |
ONO Kanta KAKEHASHI Takao MIKAMI Hiroshi HOSONO Hiromi |
651 |
(147)The Renovation of Traffic Facilitation for SHINTENMON Bridge in National Highway 266 -Temperature Analysis of Arch Abutment Part- |
KITANO Junko MIYAGAWA Masahiro FUKUSHIMA Kuniharu HARADA Shuichi |
655 |
(148)Conceptual Design of Prestressed Concrete Breakwater against Tsunami |
IKEDA Shoji HAYASHI Kazuhiko MATSUMOTO Shuichi KAWAMURA Naohiko |
659 |
(149)Design of Nariai Viaduct (Up Line) on New Meishin Expressway |
MINODA Shunsuke YAMAMOTO Taizo OOKUBO Takashi TOYODA Eiji |
663 |
(150)Planning and Design of REIMEI BRIDGE (Second Line) on the Joshin-Etsu Expressway |
KOBARI Yusuke HIGASHIDA Norimasa SAITO Masashi SHIBUYA Tomohiro |
667 |
(151)Plan and Design of NAKAO Bridge (2nd Line) |
TERADA Kohei KONO Shunsuke SHIOTA Ryoichi |
671 |
(152)Design for a PRC Simple Box Girder Bridge with a Horizontal Curve Radius of 50 Meters |
NAKAGAWA Keisuke FUKUDA Masato SASAKI Yasuhiro SATOHO Hideyuki |
675 |
(153)Study on the Deflection of the Simple PC Girders in the Hokuriku Shinkansen New Opening Section |
SHINDO Yoshinori SHIMOTU Tatuya MIZUTANI Tetuya FUNATAKE Hirotugu |
679 |
◇ (154)A Study of Design Method for Integral Bridge with Geosynthetic-Reinforced Soil using PRC Girders |
FURUYA Takutoshi TODOROKI Shuntaro OKAMOTO Masaru TAMAI Shinichi |
683 |
◇ (155)A New Hybrid Model Comprised of a 3D Lattice Model and Panel Elements to Evaluate the Change in Stress Distribution in PC Bridges with Construction Processes |
KARINO Takeshi MATSUZAWA Masakazu MIZUTA Takashi TAMAKOSHI Takashi |
689 |
◇ (156)Analytical Study of a PC Bridge by the Use of the Truss Model |
HARADA Takehiko OKADA Masayuki KARINO Takeshi TAMAKOSHI Takashi |
695 |
◇ (157)The influence of the angle between compressive force and construction joint on shear transfer strength |
FUKUTA Keisuke YUASA Koji MORIKAWA Hidenori |
701 |
(158)Performance Verification Tests of the joint for Composite Truss Structure Hakkou Bridge |
HORIUCHI Tatsuto DEGUCHI Yoshiharu ZENMOTO Takanori KOSHIJIMA Kooji |
707 |
◇ (159)Study on behavior of web shear connector in joint composite steel girder and PC girder |
SHINOZAKI Hiroo MAKI Takeshi ARIKAWA Naoki ASAI Hiroshi |
711 |
◇ (160)Related to Performance Test of the Pretensioned T-Shaped Girder Connection System Using a Precast Cross Beam |
NAGAYOSHI Yuta YOSHIKAWA Taku WATASE Hiroshi YASUDA Kiyoaki |
717 |
◇ (161)Limit state value evaluation of the outflow of a bridge by the tsunami that focuses on the pier failure |
TANAKA Akira WATANABE Ken OHNO Yuto ODA Yukinobu |
723 |
◇ (162)Influence of Patching Repair Method on Load Carrying Capacity of pre-tensioned Prestressed Concrete Beam |
BAMBA Shunsuke TANAKA Yasushi SHIMOMURA Takumi |
729 |
◇ (163)Evaluation of the Shrinkage and Creep Properties Depend on the Location of PC Beam for Infrastructure by Measuring the Long-term Strain |
OHNO Yuto WATANABE Ken
|
735 |
◇ (164)An experimental study on the shear capacity of the PHC-piles with SD490 |
MIYAHA Kiyoshi GOAN Mitsumaru AKIYAMA Mitsuyoshi |
741 |
◇ (165)Experimental research of ultra-high endurance prestressed concrete member |
SUGITA Atsuhiko NIITANI Kyouji AYANO Toshiki FUJII Takashi |
747 |