・ Contract Research |
|
■Sub-Committee |
・Committee on Design Guidelines for Joints of Prestressed Concrete
Continuous U Shaped Girder Composite Bridges (finished in July,2022) |
|
・ Committee on Rehabilitation, Repair and Reinforcement of Existing Post-Tensioned
Bridges |
|
・ Committee on Application of Continuous Fiber Reinforcement to Prestressed
Concrete
Structure (finished in September, 2020) |
|
・ Committee on Technical Study of Precast Prestressed Concrete Deck for
Replacement
(finished in September, 2018) |
|
・ Committee on Design and Construction Guidelines for Prestressed Concrete Bridge
with Polymer-Duct System (finished in September, 2015) |
|
・ Committee on Solution of Grout Defect Problem in Post-Tensioning Prestressed
Concrete Bridge in Service (finished in September, 2016) |
|
・ Committee on Guidelines for Design and Execution of Grouting for Prestressed
Concrete Structures (finished in February, 2013) |
|
・ Committee on Guidelines for Application of Anti-Corrosive Material Coated Prestressing
Steel to Prestressed Concrete Box Girder Bridge (finished in July, 2012) |
|
・ Committee on Guidelines for Maintenance of Cable-Stayed Bridge and Extradosed
Bridge (finished in April, 2011) |
|
・ Committee on English Edition of Standard for Design and Construction
of Cable-Stayed
Bridge and Extradosed Bridge (finished in March, 2011) |
|
・ Committee on Application of High-Strength Prestressing Steel to Prestressed Concrete
Structures (finished in June, 2011) |
|
・ Committee on Design and Construction for Prestressed Concrete Structures
Using
Highstrength Concrete (finished in December, 2008) |
|
|
|
|
|
|
|
|
|