・ Contract Research
Sub-Committee
 ・Committee on Design Guidelines for Joints of Prestressed Concrete
  Continuous U Shaped Girder Composite Bridges (finished in July,2022)
 ・ Committee on Rehabilitation, Repair and Reinforcement of Existing Post-Tensioned
   Bridges
 ・ Committee on Application of Continuous Fiber Reinforcement to Prestressed Concrete
   Structure (finished in September, 2020)
 ・ Committee on Technical Study of Precast Prestressed Concrete Deck for Replacement
  (finished in September, 2018)
 ・ Committee on Design and Construction Guidelines for Prestressed Concrete Bridge
   with Polymer-Duct System (finished in September, 2015)
 ・ Committee on Solution of Grout Defect Problem in Post-Tensioning Prestressed
   Concrete Bridge in Service (finished in September, 2016)
 ・ Committee on Guidelines for Design and Execution of Grouting for Prestressed
   Concrete Structures (finished in February, 2013)
 ・ Committee on Guidelines for Application of Anti-Corrosive Material Coated Prestressing
   Steel to Prestressed Concrete Box Girder Bridge (finished in July, 2012)
 ・ Committee on Guidelines for Maintenance of Cable-Stayed Bridge and Extradosed
   Bridge (finished in April, 2011)
 ・ Committee on English Edition of Standard for Design and Construction of Cable-Stayed
   Bridge and Extradosed Bridge (finished in March, 2011)
 ・ Committee on Application of High-Strength Prestressing Steel to Prestressed Concrete
   Structures (finished in June, 2011)
 ・ Committee on Design and Construction for Prestressed Concrete Structures Using
   Highstrength Concrete (finished in December, 2008)