BUILDING

 1. High-Rise Reinforced Concrete Building Using 150 MPa High Strength Concrete
— Park City Musashi Kosugi —

By Hiroshi ABE, Shingo YAMASHITA, Tadao UEDA, Hideki KIMURA  1

 2. High Performance Office Building with Precast and Prestressed Concrete
— Calsonic Kansei Research and Development Center, Headquarters —

By Yuji YAMANO, Tsutomu KOMURO, Shin-ichiro KAWAMOTO  5

 3. Structural Design of the High-Rise Building with Precast Prestressed Concrete (PCaPC) Beam
— Minato Mirai Center Building —

By Nobuyuki ARIYAMA, Kiyohide SEKI, Shinya NISHIMOTO, Osamu HOSOZAWA  9

 4. Training Facility with Latticed-Pattern Facade
— NTT Central Training Institute / The New 5th Building —

By Akinori NAKAGAWA, Kazunobu YOKOTA, Kazuhiro GOTO, Hirokazu TANIZAWA  13

 5. Combination of Flat Beams and Flat Slabs
— Onomichi Deep Freeze Logistics Center, Japanese Consumers’ Co-Operative Union —

By Ryuichi TERADA, Yuji YAMANO  17

 6. Design of “Rikkyo University LLOYD HALL”
— Planning of Precast Prestressed Concrete Slabs Considering Architectural Design and Mechanical Engineering —

By Hiroaki HARADA, Hiroaki MURAKAMI  21

 7. Design and Construction of a Hall with the Folded Plate Structural System Using Pre-Cast Concrete
— SHOWAGAKUIN ITO MEMORIAL HALL —

By Katsuhide MURAKAMI, Osamu MORISHITA, Kazutaka NAKAZAWA  25

 8. A City Hall as Citizen Autonomy Center Focused on Environment
— Tachikawa City Hall —

By Daisuke AKAZAWA  29

 9. A Base-Isolated Super-High-Rise Using a Precast Prestressed Concrete Wall Tube Structure
— Tokyo No.5 Data Center —

By Tatsumi IWATA, Nobuhide YAMAGA, Kozo TOYOTA  33

BRIDGE

10. Design and Construction of the AOKIGAWA Bridge
— New Tomei Expressway —

By Makoto OHTA  37

11. An Expressway Bridge with High Strength and Other Advanced Materials throughout the Structure
— Uratakao Bridge —

By Kenji KURODA, Takashi MATSUMOTO, Kosuke ITO, Nobuo ETCHU  41

12. Corrugated Steel Web Bridge with the World’s Longest Center Span
— Yatogawa Bridge —

By Kenji KURODA, Naofumi INABA, Hirayoshi IMAI, Hisao TATEGAMI  45

13. Design and Construction of a Post-Tensioned T-Girder Bridge with Corrugated Steel Webs
— Rebuilding of Mito Bridge —

By Kiyoshi USUDA, Katsumasa ISHIZAKI, Akihito ODAGIRI, Shinsuke NISHINO  49

14. Construction of Space Truss Bridge
— Nagata Bridge —

By Ken OUE, Hirayoshi IMAI, Mitsuru OTANI, Hideki KONDO  53

15. Construction of Viaduct Applying New Span-by-Span Erection
— Viaduct of Aoyama Area —

By Akira MOROHASHI, Takayuki ODAGIRI, Kei MURODA  57

16. Construction of Viaduct Applying U-Shaped Girder Lifting Erection
— Viaduct of Nasu-Dukuri Area —

By Akira MOROHASHI, Shinsuke KAWANO, Kei MURODA  61

17. Accelerated Construction Solution with Span-by-Span Construction
— Katano Viaduct —

By Yoshinori IGASE, Takeshi OSHIRO, Kazuhiro NISIMURA, Hiroyuki UCHIBORI  65

18. Construction of Precast Segment Bridge with Consideration of Biodiversity Conservation
— The New Tomei Expressway Matoba Viaduct —

By Kenji KURODA, Naoki HAGIWARA, Ken HANAKI, Yuki KAMINAGA  69

19. Courage and Hope Gained through Cutting the Construction Period by Half of an Overseas Project
— Hanoi City Ring Road No.3 Project Package 2 —

By Kazumitsu TAHARA  73

20. Large Cantilever Erection on Tall and Slender Pier Column
— Kawashimogawa Bridge —

By Kimio SAITO, Junichi SAMIZO, Akira TAKAHASHI, Masashi HADA  77

21. Continuous Prestressed Concrete Box Girder Bridge using P&Z Method
— Tokai-Kanjo Expressway Nagaragawa Bridge —

By Hidekatsu OKABAYASHI, Masahiro KAWASHIMA, Tsuyoshi HASEGAWA  81

22. A Bridge With Ultra-High Piers Constructed Using Ultra-High Strength Materials under a Design-and-Build Contract
— Sanagawa Bridge —

By Toru YAMAMOTO, Mitsuo KAWAKAMI, Yoshimasa NAKAI, Kazuhiro SHIBUYA  85

23. Japan’s Longest-Span Continuous Rigid Frame Box Girder Bridge
— Shintabisoko Bridge —

By Naoki NAGAMOTO, Hirosada MIURA, Yoshimasa HIRATA, Yasuyuki TAKEUCHI  89

24. Design and Construction of Pretensioned-Precast Web Bridge
— Nakashinden Viaduct —

By Kenji KURODA, Norio TEZUKA, Seiichi ARATA, Tatsuto HORIUCHI  93

25. Design and Construction of Butterfly Web Bridge
— Takubogawa Bridge —

By Kenichiro ASHIZUKA, Katsuhiko HANADA, Kenichi NAKATSUMI, Kenichi KATA  97

26. Construction of a Fin-Back Bridge by Cantilever Erection Method Using Launching Girder
— Kakamigahara Bridge —

By Kenichi TOCHIGI, Eiichi TAKASHIMA, Tatsuya HASEGAWA, Atsushi MORISHITA  101

27. Suspension Bridge by Slant Hanger Cable
— Sagimai Bridge —

By Ken OUE, Hirayoshi IMAI, Hideaki OHSIMA, Hidekazu NOGUCHI  105

28. Prestressed Concrete Composite Truss Extradosed Bridge
— Fudo Bridge —

By Yoshinao NAKAYAMA, Makoto NAKATANI, Kazutoshi HARA, HIideaki TANAKA  109

29. Construction of 3-Span Cable-Stayed Composite Bridge
— Ikina Bridge —

By Kenichi KATA, Kazuhiko OOKUBO, Mitsuharu OKAMOTO, Yuji NINOMIYA  113

30. Construction and Outline of Stonecutters Bridge, Hong Kong
— The Third Longest Cable-Stayed Bridge in the World —

By Yuji KOBAYASHI, Kaoru YAMANE  117

31. Extradosed Bridge with High-Performance Concrete and Y-Shaped Pylon
— Yumekake Bridge —

By Hiroshi AKIYAMA, Masao NAKAYAMA  121

32. Replacement of Existing Steel Trestle Bridge with Concrete Bridge
— New Amarube Bridge —

By Masaru KANEKO, Kazuo TAKEYAMA, Ikuo SAKIYAMA, Toshimitsu MAEDA  125

33. 4-Span PC Extradosed Bridge Intersecting the River at 30 Degrees
— Kyushu Shinkansen Onogawa Bridge —

By Takanori NAGAI, Takahiko NISHI, Masashi ABE, Yoshiharu NAGAE  129

34. Designs of Bridges in the Hirose-Gawa Area Determined by Competition

By Kenichiro MORI, Yoshihito HATAYAMA, Kazuya JURAKU, Takahiro EBINA  133

35. The First UFC Railway Bridge in the World
— Kayogawa UFC Railway Bridge —

By Hiroyuki MUSHA, Yohei MORIKAWA, Yukihiro TANIMURA, Masatsugu NAKANO  137

36. Continuous PC Box Girder Bridge Used Movable Scaffolding
— Hokuriku Shinkansen Imamurashinden Viaduct —

By Atsumi ISOGAI, Takahiko NISHI, Koichi GOTO, Kazuhiro KOBAYASHI  141

37. T-Shaped PC Girder Bridge Used Various Erection Methods
— Kyushu Shinkansen Daini Chikadou Viaduct —

By Osamu TERADA, Takahiko NISHI, Kengo HIROHATA, Kyomi SHIMOYAMA  145

38. Design and Construction of Shallow T-Shaped Girder Bridge
— Tagajo Daiichi Bridge —

By Yutaka SATO  149

39. Self-anchored Composite Truss Bridge Using a Suspension Structure
— Hirono Bridge —

By Masaharu KUWANO, Masakazu SENDA, Kazuhiro SUGITANI, Hisahiro NISHIZAWA  153

40. Hoover Dam Bypass- Colorado River Bridge
— The Longest Concrete Arch Bridge in the US —

By Yuhei TAKATOKU, Hirokazu ONOZAKI, Hideki FUKAMI, Toshiaki KATO  157

41. Concrete Arch Bridge Constructed by Composite Arch
— The Warumi-Ohashi Bridge —

By Yutaka YAMAHANA, Susumu KAJIKAWA  161

MARINE STRUCTURE & TANK

42. PC Structures Used in the New Runway of Haneda Airport
— Tokyo International Airport D Runway Construction Project —

By Yuji NIIHARA, Shin HAYASHI, Masami KOSHIISHI, Manabu HASHIMOTO  165

43. Concrete Gravity Foundation for Offshore Wind Turbine
— First Demonstration of an Offshore Wind Turbine in Japan —

By Koji HAYASHIDA, Kenichiro SAKATA, Osamu MAEDA, Yukinari FUKUMOTO  169

44. The Floating Offshore Wind Turbine with PC Floating Structure
— Hakata Bay Floating Offshore Wind Turbine —

By Yuji SATO, Yuji OHYA, Yusaku KYOZUKA, Tadahiko TSUTSUMI  173

45. Construction of PC LNG Tanks
— The U.S.’s Largest Receiving Terminal “GULF LNG” —

By Hiroki TOMONARI, Kotaro IKEGAMI, Kazuhide KURIYAMA  177

46. Engineering of PCLNG Tank in China
— Shanghai LNG Peak Shaving Expansion Project —

By Tomihiro AKUTSU, Hideki NAGAI, Akira HIROTANI  181

47. Construction of the Raw Water Reservoir
— The Shin-Ishikawa Water Treatment Plant —

By Tomoki ITO, Hiroshi SHIMOKAWA, Shin SUGAWARA  185

RETROFIT

48. Seismic Retrofit of Hamana Bridge
— Seismic Retrofit Technology for Large Bridges —

By Yuji KAMIYA, Masaaki TACHIKAWA, Naonori IMURA, Taku YOSHIKAWA  189

49. Rehabilitation of an Old Concrete Lohse Arch Bridge
— Replacement of All Hanger of Kimitsu Shinbashi Bridge —

By Yasuhisa FUJIWARA, Toshiya HAYASHI, Hiroshi ASAI, Yuji KUMAGAI  193

50. Development and Application of Precast Slabs Considering Rapid Replacing for Miyuki Bridge of Nishi-Meihan Expressway

By Tsuyoshi MITSUDA, Michitaro KIHARA, Akio SHIROZU, Takashi HARA  197

51. Concrete Slab Replacement in Heavy Traffic Expressway
— Mukaizano Bridge in the Kyushu Expressway —

By Yasuo FUKUNAGA, Takehiro IMAMURA, Yasuhiro MIURA, Meguru TSUNOMOTO  201